Permit Fees Schedule
Adopted 06/28/2016 Effective 07/01/2016

Permit Information?

Square foot and Graduated Fee Scale will be calculated for each Permit as Listed.
The higher permit fee calculated will be used.

All fees will be double if work begins without a permit.


New Construction Basic Permit Requirements
(This does not cover other permits that may be required.)

New Construction, Residential

 Permit Type
 Heated / Unheated Cost
 Processing Fee  $200.00 Non-Refundable
 Building
 $0.35 per square foot
 Electrical Panel  $200.00 plus $0.25 per amp over 200 amps
 Mechanical HVAC  $100.00 plus $10.00 over 5 tons
 Plumbing Only  $200.00 per dwelling
 Insulation  $100.00 per dwelling

New Construction, Commercial
 Permit Type  Heated / Unheated Cost
 Building                 
 $0.55 per square foot or Graduated Scale Fee
 Electrical  Standard or Graduated Fee Scale
 Mechanical
 Standard or Graduated Fee Scale
 Plumbing  Standard or Graduated Fee Scale
 Insulation  $100.00 per floor
 Other  $50.00 each

Renovation / Up-Fit Permit

(This does not cover other permits that may be required.)
 Type of Permit
 Cost
 Residential  $0.175 per square foot
 Commercial  $0.275 per square foot
 Graduated Fee Scale
 Cost of Project

Manufactured Home Basic Permit Requirements
(This does not cover other permits that may be required or Modular Buildings.)
 All Single, Double and Triple-Wide
 Cost
 Set-up  $200.00
 Electrical  $75.00
 Plumbing  $60.00
 Mechanical  $100.00

Moving Building
Inspection require before moving. Note:
  • Mover must provide copy of license.
  • Mover must post bond to the county in the amount of $500.00 to ensure the property is cleaned once the home has been moved. This applies to homes within the county.

Electrical Permits
 Type of Permit
 Cost
 New Construction (up to 200 amp per panel)
 $200.00
 Each additional amp above 200 amps  $0.25
 Temporary Construction Service (60 amp service)  $50.00
 Service Pole (100 amp Maximum for pump, fences, gats, etc.)  $50.00
 Low Voltage
 $150.00
 HVAC Wiring (per unit)  $50.00
 Fire Alarm Service (per system)
 $150.00
 Hood Suppression Service (per hood)
 $150.00
 Service Change (up to 200amp per panel)
 $100.00
 Each additional amp above 200 amps
 $0.25
 Graduated Fee Scale
 See Scale
 Other
 $50.00 each

Plumbing Permits
 Type of Permit  Cost
 New Construction (per system)
 $200.00
 Sewer Connection (per system)  $40.00
 Water Line Connection (per system)  $40.00
 Water Heater (per unit)  $40.00
 Lawn Sprinkler System (per system)  $100.00
 Residential Fire Sprinkler System (per system)
 $150.00
 Backflow Preventer  $100.00
 Grease Trap (per unit)  $40.00
 Other  $50.00 each

Mechanical Permits
 Permit Type
 Cost
 New Installation (per system)
 $100.00
 Each Ton Over 5 Tons
 $10.00
 Change - Out Up to 5 Tons (per system)
 $60.00
 Each Ton Over 5 Tons
 $10.00
 Gas Piping (per system)
 $50.00
 Commercial Hood (per hood)
 $60.00
 Refrigeration, Furnace, Boiler, Conversion, Heat Exchanger,
 Hot Water-Heating System and Commercial Hot Water-Heater

Based off BTUs
 Up to 100,000 BTU  $50.00
 100,001 to 250,000 BTU
 $60.00
 250,001 to 450,000 BTU  $70.00
 450,001 to 650,000 BTU  $80.00
 650,001 to 850,000 BTU  $90.00
 850,001 to 1,500,000 BTU  $100.00
 All over 1,500,000 BTU  $110.00
 Other  $50.00
 Graduated Fee Scale - Commercial See scale


Other Permits
 Type of Permit
 Cost
 ABC Inspection  $100.00
 Tent Permit  $100.00
 Therapeutic Homes Inspection  $100.00
 Day Care Inspection  $100.00
 Swimming Pool
 Includes: National Electrical Code
 Residential Building Code Appendix G Pools
 $100.00
 Generator (includes electrical and fuel supply)  $200.00
 Demolition  $100.00
 Cell Towers  $2,500.00

Sign Permits
 Type of Permit
 Cost
 Lighted Sign (includes electrical)  $100.00
 Non-Lighted Sign (includes electrical)  $75.00
 Subdivision Sign  $100.00

Freestanding sign drawings must show height from the ground to top of the sign and footing detail and must have engineered footing detail for ground signs over 42". On-site detailed plans for installation of any Signs are required for Inspection.

Graduated Fee Scale based on Cost of Project
 $0 - $100,000  $0.015 x cost of project
 $100,001 - $500,000  $1500.00 plus $.0015 x cost of project
 $500,001 - $1,000,000
 $2250.00 plus $.00079 x cost of project
 Over $1,000,000  $3040.00 plus $.0009 x cost of project

Graduated fee will apply as applicable.
Larger amount of Graduated fee or Standard fee applies.

Multi-Family Inspection Fees Basic Permit Requirements
This does not cover other permits that may be required.
 Type of Permit
 Cost
 Building  Graduated Scale per building
 Electrical  $50.00 per unit
 Plumbing  $50.00 per unit
 Mechanical  $100.00 per unit
 Insulation  $100.00 per building
 Process
 $200.00 per building
 Sprinklers  See Fire Inspector

Reinspection Fees / Penalties
 Number of Reinspection
 Cost
 1nd Reinspection  $30.00
 2rd Reinspection  $60.00
 3st Reinspection  $90.00
 Reinspection after 3rd inspection  Double each time after the third reinspection

All fees will be double if work begins without a permit.